Rope Innovation Co., Ltd. >> 2017 New Real-Time Locations GPS Tracker Watch with Sos Alarm

2017 New Real-Time Locations GPS Tracker Watch with Sos Alarm

2017 New Real-Time Locations GPS Tracker Watch with Sos Alarm
Price: US $ 1-100/Piece
Min Order: 50/Piece
Pay Type: L/C,T/T,D/P,Western Union,Paypal
Prod Model: R13S
Color: Black
Certificate: FCC ; Ce ; RoHS
GSM Frequency: Quad Band 850MHz/900MHz/1800MHz/1900MHz
GPS Chipset: U-Blox 7020
GSM Chipset: Mtk 6261d
WiFi Chipset: Mt 5931
Screen: 0.96” OLED
Size: 31.4mm*30.7mm*4.6mm
Battery: Rechargeable Lithium Polymer Battery 380mAh
Battery Working Life: 72 Hours (Interval Time : 1min )

Product Description

 2017 New real-time locations gps tracker watch with SOS alarm

 

1. Product Overview

      GPS Phone Watch R13 is designed especially for children. It is able to realize the features such as IP67 professional waterproof , camera ,real-time tracking, emergency alarm, safe zone alarm, voice message, two way voice communication, water resistance etc. We can get to know the exact situation of wearer remotely by APP on mobile to take care of your beloved one by the watch at any time anywhere.

2. Functions

     1. IP67 professional waterproof 
     2. camera
     3. GPS + LBS + WIFI accurate locate indoor and outdoor
     4. Two way voice call
     5. Voice monitoring
     6. Low battery alert
     7. Safety zone alert and support 10 safety zones
     8. Battery working time is 72 hours
     9. Water resistant
    10. Both Android and IOS APP available

3 .Specifications
Model R13
Motherboard size31.7mm*24.6mm*4.5mm
GSMyes
MTK ChipsetMT6261D
Freq BandGSM/GPRS frequency:850+1900+ 900+1800MHz
GPRS/WAP/MMSGPRS CLASS 12
Flash Memory32M bit
RAM32M bit
GPS/AGPSyes
G-sensoryes
Wifi Locationyes
GSM Callyes
Pedometeryes
PSyes
ChargingFull sealed magnetic suction charging 
SIM Card MICRO PUSH-PUSH SIM CARD Holder
Antenna 1GSM,built-in
Antenna 2GPS,built-in
Antenna 3WIFI,built-in
Display OLED
Screen0.66" OLED or 0.96" OLED
Side Key1 for power on/SOS, 1 for sim card holder; one for calling
Battery Capacity350 mah
Battery workingTime3 days
LBSyes
GPS/AGPSyes
Wifi Locationyes
Access backend serveryes
Call Functionyes
 
Sceneyes
Time and dateyes,GPS automatic synchronization











 
ROPE INNOVATION CO Ltd, a technology creative company, with its principal office at Shenzhen the special economic zone of China, is engaged in researching and manufacturing various kinds of telecom electronic products and professional in the field of GPS tracking solutions.

Within 10 years development, We had built up a large manufacturing base including molding, plastics shaping, SMT and full sets of production lines. With the purpose of improving the quality and safety of products and satisfying the requirements of all kinds of customers, we have obtained ISO9001-2008 international management system and types of certificates for products like CCC, CE, FCC, RoHS and explosion-proof certificate early or late, and succeeded in applying our tracking system in construction machine management, logistics fleet management, bus fleet management, taxi solutions and anti-theft system for private cars, person, pets and assets etc. Owning an experienced R&D team with its member of more than 30 engineers, we are able to offer customers ODM and OEM service to customize the brand-new products as per your particular requirements.

With the effort of the entire excellent team, we registered the brand of "MYROPE", gradually became one of the lead in the GPS tracking industry and enjoyed a great popularity worldwide. We were and will go on keeping the tenet of "Flawless quality, Meticulous Service and Endless Innovation" in the progress of development in order that we can all the way provide customers with advanced, stable and high performance products and satisfactory service.

We sincerely hope that we could create a more convenient and safer life for the whole civilians of the world together with you.

Send your message to this manufacturer

More >

Other Products with This Manufacturers