Shenzhen Fifotrack Solution Co., Ltd. >> 3G GPS Tracker with Real Time Location

3G GPS Tracker with Real Time Location

3G GPS Tracker with Real Time Location
Price: US $ 65-74/Piece
Min Order: 20/Piece
Pay Type: T/T,Western Union,Paypal,Money Gram
Prod Model: A500
Warranty: 2 Years
Certificate: Ce
Type: GPS Tracker
Use: Automotive
Port Number: Multichannel
Model: Integration Type
Operating Principle: GPS/GSM
Screen Size: No
Carrier Frequency: 850/900/1800/1900 MHz
Chip: U-Blox7q
Brand: Fifotrack

Product Description

1 About fifotrack 

- R&D-oriented, absolutely original supplier.    
- Brand concept: first in first out
- Core value: never lose any existing customer    
- 2 years warranty 


2 Key Features 

- 5+ years lifetime 
- High voltage protection 
- Camera  
- Fingerprint
- RFID Reader  
- iButton   
- Ultrasonic fuel sensor 
- Temperature sensor 
- Two-way communication 
- Self-define alarm following actions 



3 Tracking Functions

- GPS+GGPS+GSM Base Station Dual Tracking
- Real Time Tracking
- Time Interval Tracking
- Distance Tracking
- Direction Change Tracking
- Mobile Phone Tracking


4 Alarms
SOS AlarmGPS Antenna Cut AlarmExternal Power Cut Alarm
Engine/Door Status AlarmMileage NoticeGEO-Fence Alarm
Speeding AlarmIdling AlarmFatigue Driving Alarm
Harsh Acceleration AlarmHarsh Braking AlarmVibration Alarm
Parking Overtime AlarmGPS Jamming AlarmGSM Jamming Alarm
Internal Battery Low AlarmExternal Battery Low AlarmLogin alarm
Log out AlarmHigh temperature AlarmLow temperature Alarm

5 Other Functions
 - Stop Car Remotely
 - 8 MB Flash Memory
 - Custom Digital Input
 - OTA
 - Uploading Mode Settings for ACC ON/ACC OFF
 - Roaming Time Interval Setting
 - Mileage And Running Time Settings
 - Vehicle Original Fuel Sensor Supported (firmware version V1.08 or above)
 - Tacking Picture via Camera (Optional)
 - Driver Identification and Management via RFID Reader, iButton or fingerprint (Optional)

 - Fuel sensor Capacitive type or Ultrasonic Fuel Sensor (Optional)
 - Temperature Sensor (Optional)
 - Voice Monitoring (Optional) 
 - Two-way Calling (Optional)
 - Impulse detection (Default speedometer detection) 



6 Specification
ItemSpecification
Dimension 90*60*27mm
Weight 145g
GSM Module Quectel UC15
GSM Frequency2G:
GPS ModuleU-blox7Q
Input Voltage DC 11~36V/1.5A
Internal Battery 600mAh/3.7V
Power Consumption30-65mA standby current
Internal Battery Life 6 hours in normal working mode.
Operating Temperature -20ºC~70ºC
Humidity5%~95%
LED Light 3LED lights indicating GPS/GSM/External power status
Button/ Switch 1SOS Button, 1 power switch
Flash Memory 8MB(GPSR data 20400 units, SMS data 300 units) 
Sensor 3D Accelerator sensor
GPS Sensitivity -161dBm
GPS Start SpeedCold start 35s
Hot start 1s
Position Accuracy10m
I/O Port 4 digital input - 1 negative input, 1 positive input, 2 custom input (Default 1 positive input, 1 negative input )
2 analog input, voltage range:
  AD1 ~ 0~6V
  AD2 ~ 0~12V
2 output
1 RS232 port (camera/RFID reader)
1-wire protocol (temperature sensor/i-Button)
1 Impulse detection (Default speedometer detection)
1 USB port

7 GSM Working Frequency
 
 UMTS Frequency/MHzGSM Frequency/MHz
A500 Type8509001900210085090018001900
Type-A√ √ √√√√
Type-E √ √ √√ 
Type-T√  √√√√√

7 FIMS Tracking Software  
................................................................
Demo
Login page: www.fimsgps.com
ID: fims
Password: 123456

................................................................

1. Stop car remotely
2. Route planning
3. Driver management 
4. Re-branding domain support 
5. Support multiple maps multiple languages
6. ACC on/off status alarms, door status alarms and so on
7. Manager/User account privileges, object management.                                              
8. Smart polygon Geo-fence zone management with different colors
9. Fuel monitoring with various fuel reports, including fuel filling, fuel theft, fuel level graph and cost
10. Driving behavior analysis reports such as speeding, fatigue, idling, parking and harsh braking alarms




8 Quality Control (2 years warranty)

8.1 Components are qualified and prestigous brands 
 
GSM Module Quectel SIMCOM800GPS ModuleU-blox 7q
MCUST STM32F103RBT6Power ICMPS MP24943DN
FlashWinbond W25Q64FVSSIGCharging ICPowtech PT6112E23E
Internal batteryArmy supplier standard LDOTREOX 

8.2 Engineers 
Hardware engineer is one of 5 pioneer engineers who can design and develop intenal antenna GPS tracker in mainland. He has designed a series of classic GPS tracker models since 2004, 13+ yeeas experience in tracking. 

Software engineer is a master of famous Hunan University. He has written souce code for China national stardard project, 11+ years experice in tracking since 2005. 


8.3 Checkpoint 
- Hardware design to avoid potential problems
- Components indentify 
- Suppliers indentify   
- Material incoming quality control   
- SMT quality control ( Staff and AOI)  
- DIP quality control 
-
Inprocess Quality Control
- Final Quality Control 


9 Testimoials 

Fifotrack means "first in first out, tracking the latest technology". Deeply rooted in the core values of integrity and quick action, fifotrack is a R&D-oriented company to meet users' individual demands in the Era of IoT. Our mission is to be one of the most respected Chinese companies through innovative products, services and culture.

Set up by 3 cofounders who have avarage more than 10 years experience in GPS tracker hardware, software and marketing fields, fifotrack has built a top team which enables us to provide full GPS tracking solution to our customers, including GPS tracker hardware design and manufacture, user friendly FIMS tracking platform and professional sales technical support.

Besides, OEM/ODM project is one of our core advantages. Our in-house engineers and quick action enable us to deliver customized features faster than competitors.

Brand concept: First in first out

Core value: Never lose any existing customer

Send your message to this manufacturer

More >

Other Products with This Manufacturers