| Prod Model: |
47uf 25v High Frequency Low Impedance |
| Impedance: |
1.3Ω |
| Capacitance Tolerance: |
±20%(120Hz, 20ºC) |
| Tanδ: |
0.14 |
| Operating Temperature Range: |
-40ºC~+105ºC |
| Ripple Current: |
253marms |
| Life: |
3000~5000 Hours |
| Certificate: |
RoHS, SGS, CTI |
| Type: |
Aluminum Electrolytic Capacitor |
| Application: |
Charger, Adapter, Ballast |
| Package Type: |
Bag |
| Capacitance: |
0.47 to 1000UF |
| Usage: |
Charger, Adpter, Computer, Power Supply |
Product Description
105°c Low Voltage High Frequency 47uf 25v Radial Aluminum Electrolytic Capacitor- 47uf 25v low voltage high frequency radial aluminum electrolytic capacitor
- Load life of 3000 to 5000 hours at -40 ~ +105°c
- Size: 6.3*11mm
- Impedance:1.3Ω
- Rated Ripple Current:253mArms
- Offer OEM/ODM services
- Provide Free Sample
47uf 25v Radial Alulminum Electrolytic Capacitor is our 3000 to 5000 hours low voltage high frequency series. The radial alumium electrolytic capacitor is suitable for LED power supply, charger, adpater, Speaker and high resolution digital products,ect.Specification:
Frequency Coefficient:| Freq.(Hz) | 50 | 120 | 1k | 10k | 100k |
| 0.47~47uf | 0.70 | 0.85 | 0.90 | 0.95 | 1.0 |
| 100~470uf | 0.75 | 0.90 | 0.95 | 0.98 | 1.0 |
| 1000~10000uf | 0.80 | 0.95 | 0.97 | 0.99 | 1.0 |
Temperature Coefficient:| Temp(ºC) | +45 | +65 | +85 |
| Factor | 1.6 | 1.35 | 1.00 |
Dimensions(mm)

| ΦD | 5 | 6.3 | 8 | 10 | 13 | 16 | 18 |
| P | 2.0 | 2.5 | 3.5 | 5.0 | 5.0 | 7.5 | 7.5 |
| Φd | 0.5 | 0.5 | 0.5 | 0.6 | 0.6 | 0.8 | 0.8 |
| β | 1.0 | 2.0 |
| α | 0.5 |
Standard Size(at 120Hz, 105°c):

Rated Ripple Current: mAmrs, 105ºC, 100kHz.
Certifications:

Factory Show:
Our advantage:- We have a sound raw material cooperation system and cargo inspection mechanism.
- Products with high stability, high temperature, small size, small tolerance and so on.
- Product tolerances are strictly controlled between -15% to -10%.
- We have the world's most advanced production equipment, and improve the management process.
- We can provide custom design of your needs and provide free sample for you.
- Our products comply with the RoHS Directive and the factory conforms to the ISO 9001 management system.
FAQ:Q1. Can i have some samples for capacitors?
A: Yes, welcome sample to test and check quality,factory brand samples are free.
Q2. What about the lead time?
A: The sample needs 3-5days, the mass products needs 2 weeks for order quantity.
Q3. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL,UPS,FEDEX or TNT, it usually takes 3-5 days to arrive.Airline and sea shipping also optional.
Q4. Is it OK to print my logo on capacitor?
A: Yes,pls inform us formally before our production and confirm the design firstly based on our sample
Q5. Do you offer guarantee for the products?
A: Yes,we offer 2-3years warranty to our products.
Q6. How to deal with the faulty?
A: If the item you purchase from factory beacuse of quality problems, you can return them to us for replacement or refund. And any items returned must be in their original condition to qualify for a refund or replacement.
If you have any interesting and problems, please feel free to contact us!Pho: +86-18825879082
Website: xuanxcapacitors.com
Dongguan Xuansn Electronic Tech Co., Ltd, started in 2001 and located in Changan Dongguan, is a professional manufacturer of capacitor. After almost 16 years management development and technical improvment. Now, Xuansn Electronic Tech Co., Ltd has become a leading supplier in capacitor industry.
Dongguan Xuansn Electronic Co., Limited is specialized in the manufacturing and supply of various capacitro. Xuansn main products include various types of Radial lead aluminum electrolytic capacitor, chip type SMD aluminum electrolytic capacitor and conductive polymer aluminum solid electrolytic capacitor. At the same time, we provide OEM and ODM services for the special requirements of the buyer,
Our Products are widely used in power supply(LED power supply, switching power supply, PC power supply), computer and comtuer's peripheral, communication equipment, automotive industry, industrial electronics, military equipment, medical equipment, household appliances and other fields.
After 16 years domestic and abroad market investigation, at present our products are sold to many countries and regions including the North America, Europe, Australia, the Middle East and Asia.
Dongguan Xuansn electronic Tech Co., Ltd owned the advanced production equipments, complete quality inspection system. And We have been constantly strengthening our management and consummate the quality guarantee system. And now we acquired ISO9001quality certification, RoHS environmental certification and CTI certificates.
Company Culture
Our team is the key to our success, we share common values, ideas and beliefs. Challenge ourselves and work together for the development of the company and the industry. Our mission is to become the world's leading supplier of capacitors. We will make every effort to help our customers in the common business development and growth.