GPS Receiver for Fleet Management with Real Time Location
| Price: |
US $ 45-52/Piece |
| Min Order: |
20/Piece |
| Pay Type: |
T/T,Western Union,Paypal,Money Gram |
| Prod Model: |
A100 |
| Certificate: |
Ce |
| Use: |
Automotive |
| Model: |
A100 |
| Screen Size: |
No |
| Brand: |
Fifotrack |
Product Description
1 About fifotrack - R&D-oriented, absolutely original supplier.
- Brand concept: first in first out
- Core value: never lose any existing customer
- 2 years warranty 2 Key Features - 5+ years lifetime
- High voltage protection
- Two-way communication
- Self-define digital input
- Self-define alarm following actions
- U-blox GPS mudule
3 Tracking Functions- GPS+GGPS+GSM Base Station Dual Tracking
- Real Time Tracking
- Time Interval Tracking
- Distance Tracking
- Direction Change Tracking
- Mobile Phone Tracking4 Alarms| SOS Alarm | GPS Antenna Cut Alarm | External Power Cut Alarm |
| Engine/Door Status Alarm | Mileage Notice | GEO-Fence Alarm |
| Speeding Alarm | Idling Alarm | Fatigue Driving Alarm |
| Harsh Acceleration Alarm | Harsh Braking Alarm | Impact Alarm |
| Parking Overtime Alarm | GPS Jamming Alarm | GSM Jamming Alarm |
| Internal Battery Low Alarm | External Battery Low Alarm | |
5 Other Functions- Stop Car Remotely
- 8 MB Flash Memory
- Custom Digital Input
- Detect ACC Status to Inhibit Static Drift
- OTA
- Uploading Mode Settings for ACC ON/ACC OFF
- Roaming Time Interval Setting
- Mileage And Running Time Settings
- Two-way Calling And Monitoring (Optional)6 Specification | Item | Specification |
| Dimension | 90*60*27mm |
| Weight | 157g |
| GSM Module | SIMCOM800 |
| GPS Module | U-blox7Q |
| Input Voltage | DC 11~36V/1.5A |
| Internal Battery | 600mAh/3.7V |
| Power Consumption | 30-35mA standby current |
| Internal Battery Life | 15 hours in sleep mode, and 6 hours in normal working mode. |
| Operating Temperature | -20ºC~70ºC |
| Humidity | 5%~95% |
| LED Light | 3 LED lights indicating GPS/GSM/External power status |
| Button/ Switch | 1 SOS Button, 1 power switch |
| Flash Memory | 8MB (GPRS data 16000 units, SMS data 4000 units) |
| Sensor | 3D Accelerator Sensor |
| GSM Frequency Band | GSM 850/900/1800/1900MHz |
| GPS Sensitivity | -161dBm |
| GPS Start Speed | Cold start 35s Hot start 1s |
| Position Accuracy | 10m |
| I/O Port | 3 Digital inputs - 1 negative input, 1 positive input, 1 custom input (Default positive input) 1 Analog input, voltage range is 0-30V 2 Output 1 Microphone port 1 Speaker port 1 USB port |
7 FIMS Tracking Software ................................................................
Demo
Login page: www.fimsgps.com
ID: fims
Password: 123456
................................................................1. Stop car remotely
2. Route planning
3. Driver management
4. Re-branding domain support
5. Support multiple maps multiple languages
6. ACC on/off status alarms, door status alarms and so on
7. Manager/User account privileges, object management.
8. Smart polygon Geo-fence zone management with different colors
9. Fuel monitoring with various fuel reports, including fuel filling, fuel theft, fuel level graph and cost10. Driving behavior analysis reports such as speeding, fatigue, idling, parking and harsh braking alarms
8 Quality Control (2 years warranty)8.1 Components are qualified and prestigous brands | GSM Module | Quectel SIMCOM800 | GPS Module | U-blox 7q |
| MCU | ST STM32F103RBT6 | Power IC | MPS MP24943DN |
| Flash | Winbond W25Q64FVSSIG | Charging IC | Powtech PT6112E23E |
| Internal battery | Army supplier standard | LDO | TOREX |
8.2 Engineers
Hardware engineer is one of 5 pioneer engineers who can design and develop intenal antenna GPS tracker in mainland. He has designed a series of classic GPS tracker models since 2004, 13+ yeeas experience in tracking.
Software engineer is a master of famous Hunan University. He has written souce code for China national stardard project, 11+ years experice in tracking since 2005. 8.3 Checkpoint
- Hardware design to avoid potential problems
- Components indentify
- Suppliers indentify
- Material incoming quality control
- SMT quality control ( Staff and AOI)
- DIP quality control
- Inprocess Quality Control
- Final Quality Control 9 Testimoials
Fifotrack means "first in first out, tracking the latest technology". Deeply rooted in the core values of integrity and quick action, fifotrack is a R&D-oriented company to meet users' individual demands in the Era of IoT. Our mission is to be one of the most respected Chinese companies through innovative products, services and culture.
Set up by 3 cofounders who have avarage more than 10 years experience in GPS tracker hardware, software and marketing fields, fifotrack has built a top team which enables us to provide full GPS tracking solution to our customers, including GPS tracker hardware design and manufacture, user friendly FIMS tracking platform and professional sales technical support.
Besides, OEM/ODM project is one of our core advantages. Our in-house engineers and quick action enable us to deliver customized features faster than competitors.
Brand concept: First in first out
Core value: Never lose any existing customer
More >
Other Products with This Manufacturers