GSM OBD2 GPS Tracker Get Realtime Location & OBD Data From Car ECU
| Price: |
Negotiable/Piece |
| Trade Terms: |
FOB,CFR,CIF |
| Min Order: |
1/Piece |
| Pay Type: |
T/T,Money Gram,Western Union |
| Prod Model: |
obd 2 gps tracker |
| Markets: |
North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
| Dim: |
64.5×50×27mm |
| Weight: |
60g |
| Network: |
GSM GPRS |
| Band: |
850/900/1800/1900MHz |
| Antenna: |
Internal GSM GPS Antenna |
| Sos Button: |
Yes |
| Backup Battery: |
Chargeable 3.7V 200mAh Li-Battery |
| Main Functions: |
GPS Tracker, Read OBD Data, Fuel Report |
| Extensional Cable: |
Optional |
| USB Cable: |
Optional, for GPRS Data Configuration |
| Type: |
GPS Tracker |
| Use: |
Automotive |
| Port Number: |
Multiplex Multi-purpose Channel |
| Carrier Frequency: |
Dual-Frequency |
| Operating Principle: |
OBD GPS Tracker |
| Model: |
GPS306A OBD Tracker |
| Screen Size: |
No Screen |
| Chip: |
CB900 |
| Brand: |
Coban |
| Certification: |
ISO9001 |
Product Description
COBAN NEW obdii gps tracking gps306 plug tracker with Fuel report , Diagnosis code , ACC status ,temperature
Model : GPS306
how does the GPS Tracker work?
GPS306 is our newly designed plug-and -play OBD tracker. It could read OBD parameters from car ECU and GPS tracking for car location;
All data will be transmit to the backend server for remote diagnostic and tracking purpose.
5 tracking solutions:
SMS tracking by calling, return google map link
Absolute street address by sms
Free software
Free IOS/Android app
Optional web server

Specifications
Content | Specification |
| DIM | 64.5×50×27mm |
| Weight | 60g |
| Network | GSM/GPRS |
| Band | 850/900/1800/1900Mhz |
| GPS Sensitivity | -165dBm |
| GPS Accuracy | 5m |
| GPS Start Time | Cold status 30s Warm status 11s Hot status 1s |
| Backup Battery | Chargeable changeable 3.7V 200mAh Polymer Li-Battery |
| Storage Temp. | -40°C to +85°C |
| Operation Temp. | -20°C to +70°C |
| Humidity | 5%--95% non-condensing |
Applying directions:
12-24V cars , vehicles , trucks , fleet management
OBD tracker Main features :
1.Vehicle OBD II tracker (9-40V)
2.Location based service(LBS) + GPS double real time tracking solution Monitor
3.SOS panic button
4.Geofence,movement,overspeed alarms.low battery, ext.power off alarm.
5.Alarms under ARM :Shock/ACC alarms.
6.Request for OBD data by SMS:
Fuel measurement
fuel consumption
mileage
speed
engine status
Diagnostic Trouble Codes,etc
7.Trouble and maintenance notification
8.multiple power-saving mode :
Sleep by time / shock sensor
deep sleep
awake at specific time
9.Save GPRS traffic mode
10.Built-in memory for 16,000 positions
11.Built-in 200 mA polymer battery
12.SMS tracking on cell phone with google map link
13.Absolute street address by SMS
14.Web server, free PC tracking soft, Mobile phone APP
OEM service available .
Warranty
1. One year warranty for all models.
2. All products have been strictly Quality Checked in house before packing.
3. All products have been well packed before shipping.
OEM&ODM Service
1.Customize logo / package
2. Customize firmware

Shenzhen Coban Electronics Co., Ltd is a private export-oriented enterprise founded in 1999, 90% of the products are exported, and we have many years of research and development, production and management experience in automotive electronics, security products, wireless communications terminal equipment, and other fields.
As a high-tech enterprises, we have a strict management system, and have obtained the authentication of CCC, CE, FCC and UL ISO9001, etc. So far, our products have been well marketed in 107 countries and regions in the world. Our company has set up research and development centers, including GPS R & D department, GSM R & D department and system integration Department. All the products are developed independtly and obtained a number of national patents. So the professional R D team, efficient production team provide good foundation with high-quality products. Quality has always been part of the company's most stressed. Before all the products entering the market, they have been tested rigorously such as high and low temperature aging test, vibration test, the noise tests, audio and video indicators decomposition tests.
Our company specialized in GPS tracker, car anti-theft alarm system.
Except the advantage of abundant in human resources, since we count on long standing business relationships, we deserves wide range of cooperation with the well-known Chinese and foreign high-tech companies and service in the long term. In order to meet the developing of the markt, our aim is to transform the latest and the best research fruit into productive quickly, develope science and technology, serve the society.
More >
Other Products with This Manufacturers